NuSource LLC
  • ABOUT
    • CAPABILITIES >
      • FABRICATION
      • ENGINEERING
      • FACILITIES
    • NEWS
  • ENGINEERING
  • FABRICATION
  • QUALITY
  • TEAMING AGREEMENTS
    • NUCCORP
    • PALL CORP
    • SWAGELOK
    • WATLOW >
      • EDG Applications
      • Pressurizer Heaters
    • XYLEM / AM STANDARD

PARTNER HIGHLIGHT: PALL CORPORATION

In 2015, NuSource entered into an Exclusive Teaming Agreement with Pall Corporation. Under this agreement, NuSource will provide Safety Related (10CFR 50 Appendix B), and ASME Section III, replacement parts for items installed in the United States, Canada, Latin America and Republic of Korea.  NuSource has the experience with nuclear plant design and licensing, knowledge of replacement part projects, and vessel design to support the replacement of Pall components.
“Like for Like” Replacements
​

NuSource can provide “Like for Like” replacements utilizing original (OEM) drawings, and design calculations, while using similar manufacturing processes and techniques. This is the most cost effective approach for replacement spare parts. 
Safety Related Filter / Cartridge Elements
​

Through our agreement with the (OEM) NuSource has the ability to obtain the design information of the original equipment, filter or cartridge elements. We use this data to develop our commercial grade dedication plan including the dimensional inspection and flow testing criteria to verify these characteristics.  This gives NuSource the ability to provide true safety related replacement parts
Picture

FEATURED PRODUCTS


NUCLEAR PLANT APPLICATIONS
  • NSSS System Filters
  • CVCS Submicronic Systems
  • Radwaste Filtration 
  • Reactor Water Cleanup (RWCU)
  • Spent Fuel Pool
  • Seal Water Injection
  • Turbine Lube Oil and Steam Turbine Management
  • Hydrogen Seal Oil
  • EHC Fluid Treatment
​
​ORIGINAL SPARE PARTS
  • Complete Filter Housing
  • Replacement Covers
  • Trunion Bolting
  • Hinge Replacements
  • Supports 
Picture
NEW APPLICATIONS
​
​
NuSource can prepare a new Certified Design Specification and the supporting ASME Code calculations necessary to install a “new” Pall Filter on any system inside a nuclear power facility. 
​
  • Minimize radioactive exposure
  • Meet today’s stringent regulatory requirements
  • Reduce total cost of ownership
Download the Brochure
The NuSource Quality Assurance Program meets the highest standards in the field, including 10CFR50 Appendix B and the ASME Boiler and Pressure Vessel Code “N” Stamp. These accreditations allow NuSource to design and fabricate almost any item needed to support the safe operation of a nuclear power plant.
  • ASME Section III (NCA 3800/4000) 
  • 10CFR50 Appendix B 
  • ASME NQA-1
  • ANSI N45.2
  • 10CFR 21
Picture
Picture
Quality Assurance
​N Stamp Certification

QUICK LINKS​
Contact Us
Teaming Agreements
​Engineering
Fabrication
News
​

NuSource LLC
320 King Street
​Alexandria, VA 22314
Corporate:  (571) 482-7404
wwaters@nusourcellc.com

© 2022 NuSource, LLC. All Rights Reserved
  • ABOUT
    • CAPABILITIES >
      • FABRICATION
      • ENGINEERING
      • FACILITIES
    • NEWS
  • ENGINEERING
  • FABRICATION
  • QUALITY
  • TEAMING AGREEMENTS
    • NUCCORP
    • PALL CORP
    • SWAGELOK
    • WATLOW >
      • EDG Applications
      • Pressurizer Heaters
    • XYLEM / AM STANDARD